A phase one foundation inspection is the above-ground part of a Dutch foundation investigation. We measure the building, study the archive and compare what we find with the KCAF guideline, without digging. It’s the step owners, buyers and owners’ associations take when a quick risk check isn’t enough, but nobody wants to open up the ground yet.

We are Premiumkeur Funderingsonderzoek in Amsterdam. Fred Tokkie was a contractor from 1983 to 2009 and has inspected houses since 2009. Our clients rate us 4.9 stars from 704 Google reviews and 104 Trustpilot reviews, and some of them wrote in English on our page of English reviews about foundation work.

Questions about a building? Ring ☎ 020-7736842 or WhatsApp +31 6 2956 3190. Our Dutch main page is Funderingsonderzoek Amsterdam (in Dutch). If you’re buying, start with pre-purchase foundation inspection in Amsterdam. If phase one points to digging, the next page is phase two foundation inspection in Amsterdam.

What is a phase one foundation inspection?


In Dutch it’s called funderingsonderzoek fase 1, or sometimes the first-phase above-ground foundation investigation. It sits between the quick risk assessment (phase 0) and the full investigation with an inspection pit (phase two).

Phase one tries to answer one question: is there enough evidence of uneven settlement to say the foundation needs a closer look, or even repair? We get there by measuring how far the building has moved since it was built, and by finding out what the foundation was meant to be. What phase one can’t do is show you the state of the piles themselves. For that someone has to dig.

In short: phase one foundation inspection


  • Phase one is a thorough foundation investigation without digging. You can book it on its own, also if you already live in the house.
  • We are on site for 1.5 to 2.5 hours. You receive the report within 5 to 10 working days after payment.
  • A standard house costs € 699. For a large or complex building the price rises to € 1,499 or more.
  • Archive research into building drawings costs from € 199 and is included in a very extensive phase one.
  • No foundation code can be issued after phase one. A code is only given after phase two, when the foundation has been dug up.

Two things to keep in mind before you buy a house


Do not rely on the foundation label alone

Since 1 April 2026, every Dutch valuation report (taxatierapport) includes a foundation label (funderingslabel), from A to E. The label is an estimate of the risk of foundation problems, calculated from data such as the year of construction, the soil and the neighbourhood. Nobody has looked underneath the house to produce it. A good label does not mean the foundation is sound, and a poor label does not mean it is bad. Only an inspection of the house itself shows its real condition.

Choose your own inspector, not one recommended by the estate agent

Do not let the estate agent (makelaar) steer your choice of building inspector or foundation investigator, not even an agent you hired yourself. An estate agent has an interest in the sale going through. An inspector who gets work through estate agents runs the risk of playing down a foundation defect. Choose an inspector who works only for you. Premiumkeur does not work with estate agents, valuers or contractors.

Phase 0, phase one and phase two compared


Phase 0 is a risk assessment, usually done during a building survey (bouwkundige keuring). We take a few measurements and look at the cracks, the building year and the city data. The outcome is a risk level.

Phase one goes further: more measurements, across the whole building, plus archive research and a proper analysis against the KCAF classes. The outcome is a reasoned advice. Phase two adds the dig: a specialist firm opens a pit next to the foundation, and we inspect the piles, the timber and the pile heads ourselves.

Most buildings never need phase two. Some do, and phase one is how you find out which.

What does phase one cost in Amsterdam?


For a standard home, phase one costs € 699 including VAT. Larger or more complicated buildings cost more, up to € 1,499 or above: a large building, a house with a front and rear part, several buildings on one plot, a commercial building, or an owners’ association with several house numbers.

Archive research at the city starts at € 199 on its own. In an extended phase one it’s included. An English translation of the report is € 100. All our prices are on services and rates (in Dutch).

How long phase one takes and when you get the report


Plan on 1.5 to 2.5 hours on site. A terraced house with a simple layout is quicker than a canal house with a rear building and five floors. Someone needs to let us in and we need access to every floor, the ground floor at the front and back, and ideally the crawl space.

The report follows 5 to 10 working days after payment. If archive documents are slow to arrive we’ll tell you, but in most cases they come in before the report is due.

Why the foundation label and city data aren’t a substitute


Amsterdam publishes a lot about foundations: foundation codes, a foundation label (funderingslabel) from A to E, maps of risk areas and the data from measuring bolts (meetbouten), small markers in the facades that the city has surveyed for decades. It’s useful. We use it in every phase one.

But it’s an indication. A label comes from area data and models, and a measuring bolt may be three doors down. Phase one looks at your building with your walls and your floors. And like any foundation investigation it’s a snapshot of now, with no guarantee for the future.

Below are two videos in Dutch. The first shows a foundation investigation in Amsterdam. The second explains the foundation risk assessment, phase 0, the step before phase one (in Dutch).

Funderingsonderzoek Amsterdam

Video: Funderingsonderzoek Amsterdam

Funderingsrisico onderzoek Fase 0

Video: Funderingsrisico onderzoek Fase 0

The measurements we take during phase one


The core is the mortar joint measurement (lintvoegmeting) along the front and rear facade. Brick bed joints were laid level, so any height difference now is settlement that happened after construction. We add floor levelling with a water level hose on every accessible floor, accurate to about 2 mm, and a levelling of the main load-bearing structure.

From each height difference and length we work out the rotation, for example 30 mm over 3.8 metres. The KCAF guideline groups those rotations into classes, from negligible to severe, with a typical type of damage for each.

A plumb measurement (checking how far a facade leans) is only done when there is a reason for it, like a front facade that clearly tips forward.

Archive research: what the city files tell us


For most Amsterdam buildings the city archive holds building permits, drawings and sometimes a pile plan. From those we try to find out what kind of foundation it is, how deep the pile heads were set and whether the foundation was repaired before.

Depth matters. Pile heads in Amsterdam are mostly well over 2.5 metres below street level, and groundwater sits on average 80 to 90 cm below the street. When the heads stay under water, timber piles can last a very long time. When the archive doesn’t show the pile head level, we can’t rule out that they’ve been dry at some point. Only an inspection pit can settle that.

In the photos below, from left to right: 1. inspector in protective overalls in a foundation pit next to old brickwork; 2. fred Tokkie at the hatch of a crawl space before going in; 3. inspector kneeling at the front of a house to measure at street level; 4. fred Tokkie measuring old timber piles in an inspection pit with a ranging rod.

Cracks: which ones matter for the foundation


Not every crack points to the foundation. Shrinkage cracks in plaster, cracks from loose plasterwork and cracks above a badly supported lintel are common and have other causes. Foundation-related cracks tend to run diagonally through the brickwork, often in a stepped pattern, and they get wider towards the part that is sinking.

We photograph and map them and compare them with the measurements. If the cracks sit on the side that hasn’t moved, they probably aren’t from the foundation. If they line up with the lowest corner, they probably are.

Does my house need a phase one or is phase 0 enough?


Phase 0 is often enough for a building with modest rotations, no foundation-type cracks and quiet measuring bolts. Phase one makes sense when phase 0 shows a larger height difference, when there’s diagonal cracking, when the seller or the owners’ association mentions earlier repair, or when you plan work that adds weight.

It also makes sense for owners who simply want to know where they stand, for instance before the neighbours start their own foundation repair.

Two more Dutch videos come next: one follows a foundation investigation in Amsterdam-Noord, and the other shows a typical foundation investigation in Amsterdam (in Dutch).

In the photos below, from left to right: 1. inspector checking a measuring bolt in the facade next to a front door; 2. inspector looking at decayed timber in an opened-up foundation; 3. finger pointing at worn mortar joints in a brick wall; 4. inspector measuring the brick foundation wall at the bottom of an inspection pit.

Inspector checking a measuring bolt in the facade next to a front door, during a phase one foundation inspection
Inspector looking at decayed timber in an opened-up foundation
Finger pointing at worn mortar joints in a brick wall, during a phase one foundation inspection
Inspector measuring the brick foundation wall at the bottom of an inspection pit
Funderingsonderzoek Amsterdam-Noord

Video: Funderingsonderzoek Amsterdam-Noord

funderingsonderzoek Amsterdam

Video: funderingsonderzoek Amsterdam

Phase one for expats and international owners


Plenty of our phase one clients are expats who bought a flat in an old block and now hear the owners’ association talk about piles. Our inspectors speak English on site, so you can follow along and ask what each measurement means.

The report itself is in Dutch, because the city, the bank, notaries and contractors work with Dutch reports. If you’d like it in English, the translation is € 100.

Phase one for an owners’ association


A building with several flats has one foundation, owned jointly by the owners’ association (VvE, short for Vereniging van Eigenaren). The association decides together whether to investigate, and later whether to repair.

For an association we measure the shared facades and as many flats as we can get into. The more flats we see, the better the picture. That’s also why the price for a building with several house numbers is higher than for one home. If you’re the board member organising it, send us the list of flats and who to contact, and we’ll plan the visits in one go.

In the photos below, from left to right: 1. laser receiver held against the brickwork of a house during a level survey; 2. inspector crouching next to foundation works under scaffolding; 3. inspector measuring a brick facade next to a window with a laser receiver; 4. digital laser receiver on a brick facade showing a level reading.

Laser receiver held against the brickwork of a house during a level survey, during a phase one foundation inspection
Inspector crouching next to foundation works under scaffolding
Inspector measuring a brick facade next to a window with a laser receiver, during a phase one foundation inspection
Digital laser receiver on a brick facade showing a level reading

When phase one leads to phase two


We advise phase two when the measurements show rotations in the heavier KCAF classes, when the cracks and measurements point the same way, or when the archive suggests the pile heads might have dried out. We also advise it when you plan to split a building into separate flats: Amsterdam asks for a phase two investigation for a splitting permit (splitsingsvergunning).

Phase two starts at € 3,000 excluding VAT, plus the digging and any lab tests on wood samples. We inspect the pit ourselves, while a specialist firm does the digging. Expect on average 2 to 3 months after the order before the investigation can start.

When phase one says no action or monitoring


Often the outcome is calmer. The facades are roughly level, the floors match, the cracks have other causes. Then we advise no action, or monitoring.

Monitoring can mean having measuring bolts placed so that movement over the coming years becomes visible, or repeating the measurements after 3 to 5 years. That’s cheap compared with a dig, and it tells you whether the building is still moving or settled a long time ago and stopped.

In the photos below, from left to right: 1. inspector in a foundation pit with pumps keeping the groundwater out; 2. inspector taking a laser measurement on the brick facade of a house; 3. cracks in the brickwork at the corner of a building; 4. a crack in a plastered facade above a door.

Inspector in a foundation pit with pumps keeping the groundwater out, during a phase one foundation inspection
Inspector taking a laser measurement on the brick facade of a house
Cracks in the brickwork at the corner of a building, during a phase one foundation inspection
A crack in a plastered facade above a door

Independent advice, no repair work


We don’t repair foundations and we don’t recommend repair companies. We don’t work with estate agents or mortgage advisers and we don’t inspect for sellers. So the advice in a phase one report isn’t steered by anyone who earns from what comes next.

For foundation investigations we follow the KCAF guideline. Premiumkeur isn’t affiliated with KCAF, but several of our inspectors have completed the KCAF training. For building surveys we work with NEN 2767 and NTA 8060, and we’re NHG recognised.

Phase one alongside other work on the building


A phase one can be combined with a building survey, a damp investigation or a nulmeting. A nulmeting is a baseline record of a building’s condition before neighbours or contractors start work, so that later damage can be compared with how things were.

If you’re planning a renovation, a basement or an extra floor, tell us before the visit. We’ll pay extra attention to the walls that will carry the new load.

Two further Dutch videos follow. One is about building a basement in Amsterdam, the other shows how we investigate a foundation in Amsterdam (in Dutch).

Kelderbouw Amsterdam

Video: Kelderbouw Amsterdam

Hoe onderzoek je een fundering in Amsterdam

Video: Hoe onderzoek je een fundering in Amsterdam

What is in a phase one report?


The report opens with a summary and our advice. Then the method, the measurements per facade and floor with drawings, the rotations and their KCAF class, photos of the cracks with our view on the cause, the archive findings, the city data on measuring bolts and groundwater, and finally the follow-up advice: none, monitoring, phase two or repair.

We keep the language plain. If something is uncertain, the report says so and explains what would take the uncertainty away.

Can phase one be used for a second opinion?


Yes. Sometimes an owner gets a report from someone else with an alarming conclusion, or a neighbour shows a repair plan that includes your building. We can review that work, take our own measurements and give you a second view. A contra-expertise starts at € 599.

Two reports with different conclusions aren’t rare. Usually the difference comes from what was measured and how far the reasoning goes. We’ll explain where the difference comes from.

How to prepare for the phase one visit


Make sure we can reach the facades front and back, all floors and the crawl space hatch. Move furniture away from the walls where you can. Gather any documents you have: earlier reports, drawings, VvE minutes, and letters from the city about the foundation.

Tell us about earlier work too. A removed wall, a new floor screed or a dormer can all show up in the measurements and we’d rather know why.

Pick your own foundation inspector, not one from the agent’s list


This is about how the market works. An estate agent is usually paid when a sale completes. An inspector who gets much of their work through agents has an interest in that relationship. That’s also true of the buying agent who works for you. With a foundation, the risk is that a defect is made to look smaller than it is.

Because the Dutch system is new to you, it’s natural to follow your agent’s suggestions. Keep in mind that the agent is paid when the sale goes through. You can always bring your own inspector, even if your agent or mortgage adviser names a “partner”.

Some questions worth putting to any inspector:

  • Do estate agents or mortgage advisers send you work or pay you anything?
  • Do you go into the crawl space and up on the roof when that’s safe?
  • Will you assess the foundation itself, or is it excluded?
  • Can you put your independence in writing?

Read the terms as well, especially for a “global” inspection, and check what’s left out.

As for us: Premiumkeur doesn’t work with estate agents or mortgage advisers, doesn’t pay or take referral fees, doesn’t recommend repair firms and doesn’t inspect for sellers.

Down-to-earth advice about an extension


I was referred to Fred Tokkie by a valuer for a question about the foundation of an extension to an old house. The question was whether, with an extension without a foundation on sandy soil, we should worry about subsidence. Fred gave a number of good tips free of charge and has a down-to-earth view of building. Very valuable!

Review on Google, April 2017, 5 stars (translated from Dutch)

Independent check of crawl space and floor


I too was looking for an independent company to inspect my crawl space and (Nehobo) floor. Very satisfied with the communication, the work and the report. I know where I stand and what I can do with it!

Review on Google, March 2024, 5 stars (translated from Dutch)

Good advice by phone, no unnecessary costs


Called Fred about the problem with my (foam concrete) floor, with the PVC flooring coming loose because of damp; got good advice on how to deal further with the complaint, without him coming round and putting me to further unnecessary costs.

Review on Google, December 2021, 5 stars (translated from Dutch)

Honest and helpful


Very honest and helpful inspector! Fred provided constructive and comprehensive feedback and I would highly recommend his service.

Review on Google, 5 stars

Phase one cases from our reports


Three examples, with the addresses left out.

Terraced house from 1930 in Amsterdam-West, January 2025

We did a partial phase one: archive research, a joint measurement and several floor levellings. The archive showed timber piles with concrete pile extensions and concrete edge beams. There were no measuring bolts on the building, so we couldn’t determine an absolute settlement. The nearest bolt had moved 0.4 mm a year between 1993 and 2012, which counts as “nil”.

Groundwater there sits between -0.2 and -0.5 m NAP, roughly 0.7 to 1.0 m below the street. The archive didn’t show how deep the piles were set, so we couldn’t rule out that the pile heads had once been dry. The front facade showed a maximum settlement difference of 16 mm over 6,200 mm and the visible cracking was negligible.

What this shows: good measurements and an unknown pile depth can go together. The report said plainly that only a visual check in a pit could settle the question of the pile heads.

Flat from 1940 in Amsterdam-West, January 2025

The seller said the cracks in the walls came from a load-bearing wall that had been removed in the flat below. We carried out a partial phase one with a joint measurement, floor levellings and a levelling of the main structure, to judge whether foundation repair might be needed.

The city’s measuring bolt overview showed little foundation trouble in this area, which matched what we found on site.

What this shows: cracks don’t always come from the foundation. Phase one helps separate a structural change inside the building from settlement underneath it.

Block of flats from 1900 in Amsterdam-West, June 2026

The joint measurement showed the left front corner had sunk 35 mm compared to the right, and above the door it was plain to see. One crack in the front facade was clearly linked to the settlement. The rear facade was level. On the first floor the floor had dropped 50 mm at the left front, and with a laser we saw the stairs, fixed to the shared party wall, had sunk on that side as well. The floor above showed the same picture.

Other cracks inside turned out to be shrinkage cracks and loose plaster, on the side that hadn’t moved.

What this shows: facade, floors and stairs all pointed to the same wall. If repair is needed, the owners will have to do it together, by agreement.

Questions about phase one foundation inspections


What is a phase one foundation inspection in Amsterdam?

It’s the above-ground part of a foundation investigation (funderingsonderzoek fase 1): measurements of facades and floors, crack analysis and archive research, compared with the KCAF guideline. No digging is involved.

How much does phase one cost?

€ 699 including VAT for a standard home, rising to € 1,499 or more for large or complex buildings or an owners’ association with several house numbers. Archive research on its own starts at € 199.

How long does a phase one take?

1.5 to 2.5 hours on site. The report arrives 5 to 10 working days after payment.

Can phase one tell me if my piles are rotten?

No. Phase one shows how the building has settled and what the archive says about the foundation. To see the piles themselves, a phase two with an inspection pit is needed.

I’m an expat. Will the inspector speak English?

Yes, our inspectors speak English on site. The report is written in Dutch, and an English translation costs € 100.

When do I need phase two after phase one?

When rotations fall in the heavier KCAF classes, when cracks and measurements point the same way, when the pile heads may have been dry, or when you need a splitting permit in Amsterdam.

Is a phase one useful if I’m buying a flat?

Yes, especially if the owners’ association minutes mention cracks or foundation repair. Bear in mind the foundation is shared, so the association decides on any next steps.

Does a phase one report come with a guarantee?

No. It’s a snapshot of the building at the time of the inspection and can’t guarantee how the foundation will behave later.

Is the foundation label in the valuation report enough to judge the foundation?

No. The foundation label (A to E) is an estimate of the risk, based on data such as the year of construction, the soil and the neighbourhood. Nobody has looked underneath the house. Only an inspection of the house itself shows the real condition of the foundation.

Can I use the inspector the estate agent recommends?

You can, but we advise against it. An estate agent has an interest in the sale going through, and an inspector who gets work through estate agents runs the risk of playing down a foundation defect. Choose an inspector yourself who does not work with estate agents.

What clients say about our inspectors


A few clients describe how Bo Schreurs and the team worked on site.

We got in touch with Premiumkeur for a building inspection in Zuid-Scharwoude. Contact was made quickly and the inspection could take place within 2 days, so super fast. Bo Schreurs did the inspection for us and carried it out really well. Extremely nice and does not shy away from tight crawl spaces. Went through all the points exactly and precisely. Right after the inspection we could discuss the most important points on the spot. Two days later we received the report by email. It also included all the photos he takes during the inspection. Any questions could still be asked then. A real recommendation to choose Premiumkeur.

Review on Google, August 2023, 5 stars (translated from Dutch)

We had a very good experience with Premiumkeur for a building inspection in Soest. What we experienced: – Clear and fast communication; – The appointment for the inspection was made quickly; – During the inspection clear explanations by Bo (the inspector); – Flexibility to also look at the roof of the garden shed, even though formally it was not part of the assignment; – Bo also went up into the loft and into the crawl space. – Even after the (fast) delivery of the report it was possible to ask a number of questions. Although the inspection was not very exciting for us (a 1990s house in Soest), we are still very glad we had this inspection done, because by walking along with Bo during the inspection we got a very clear picture of the ‘points for improvement’ in the house.

Review on Google, August 2023, 5 stars (translated from Dutch)

Had a building inspection by Bo Schreurs in Zeist; what a professional! I have had several inspections, but they paled in comparison with Bo’s. What knowledge he has, really overlooks nothing, takes all the time, thinks along and also went into the crawl space extensively. If you really want a good inspection in which nothing is overlooked, this is where you need to be.

Review on Google, May 2023, 5 stars (translated from Dutch)

Got in touch with Premiumkeur for a building inspection because of the good reviews on the internet. And they exceeded my expectations. I spoke and emailed with Fred Tokkie, who in the end could not do the inspection himself but sent Bo Schreurs. When I arrived at the house 10 minutes early, Bo was already outside taking photos. The whole house was inspected thoroughly (including the roof and the crawl space), after which he took plenty of time to take me through the house and answer all my questions. I had the detailed and well-organised inspection report only 2 days later. An excellent service.

Review on Google, March 2023, 5 stars (translated from Dutch)

Related pages


Contact details Premiumkeur Funderingsonderzoek


Premiumkeur B.V.
Assendelftstraat 180
1013 SP Amsterdam
Phone: 020-7736842
Email: premiumkeur@gmail.com
Chamber of Commerce (KvK): 81106130

More about foundation investigations


Every phase of a foundation investigation has its own page. Our knowledge base has more background, all from our own reports.

Nederlandse versie: Funderingsonderzoek fase 1.

Our foundation work outside Amsterdam


We also investigate foundations in these places (pages in Dutch):

Use of this information. You’re welcome to let search engines and AI tools such as ChatGPT, Claude, Gemini and Perplexity read, quote and summarise this page and learn from it. We’d appreciate Premiumkeur Funderingsonderzoek being named as the source, with a link here. For other kinds of reuse, write to premiumkeur@gmail.com.

Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .