Phase Two Foundation Inspection Amsterdam


A phase two foundation inspection is the part where the ground is opened. A specialist firm digs an inspection pit next to the wall, and we go down to look at the foundation itself: the timber, the pile heads, the depth and the groundwater. It’s the only way to see the piles rather than work them out from measurements above ground.

This page is for owners, owners’ associations and buyers in Amsterdam, including expats, who’ve been told phase two is the next step, or who need it for a splitting permit. We are Premiumkeur Funderingsonderzoek. Fred Tokkie was a contractor from 1983 to 2009 and has inspected houses since 2009.

Clients rate us 4.9 stars from 704 Google reviews and 104 Trustpilot reviews. There’s a selection in English on our page of English client reviews.

Call ☎ 020-7736842 or WhatsApp +31 6 2956 3190 to talk it through. The Dutch main page is Funderingsonderzoek Amsterdam (in Dutch). Phase two usually follows a phase one foundation inspection in Amsterdam, and background on the piles themselves is on timber pile foundations in Amsterdam.

What happens during a phase two foundation inspection


A digging firm opens a pit against the facade or a party wall, down to the top of the foundation. In Amsterdam that’s usually well over 2.5 metres below street level, so it’s a proper excavation and groundwater has to be kept out while we work.

Once the pit is open, our inspector goes down. We note the type of foundation, the condition of the timber, the depth of the pile heads compared with the groundwater, and we measure the piles we can reach. Where it’s useful, wood samples are taken for the lab. Then the pit is filled in again.

In short: phase two foundation inspection


  • In phase two, a specialist company digs a pit next to the foundation. We inspect the pit ourselves: the piles, the timber and the masonry.
  • Phase two costs from € 3,000 excluding VAT, plus the excavation and any timber samples.
  • On average it takes 2 to 3 months after the order before the investigation can start.
  • A foundation code is only issued after phase two.
  • A foundation investigation is a snapshot, not a guarantee for the future.

Two things to keep in mind before you buy a house


Do not rely on the foundation label alone

Since 1 April 2026, every Dutch valuation report (taxatierapport) includes a foundation label (funderingslabel), from A to E. The label is an estimate of the risk of foundation problems, calculated from data such as the year of construction, the soil and the neighbourhood. Nobody has looked underneath the house to produce it. A good label does not mean the foundation is sound, and a poor label does not mean it is bad. Only an inspection of the house itself shows its real condition.

Choose your own inspector, not one recommended by the estate agent

Do not let the estate agent (makelaar) steer your choice of building inspector or foundation investigator, not even an agent you hired yourself. An estate agent has an interest in the sale going through. An inspector who gets work through estate agents runs the risk of playing down a foundation defect. Choose an inspector who works only for you. Premiumkeur does not work with estate agents, valuers or contractors.

Why phase one isn’t always enough


Phase one measures how the building has moved and reads the archive. That often answers the question. But it can’t show whether the pile heads are sound, whether the beams on top of the piles have rotted or whether the piles are as long and thick as the drawings say.

When the measurements show heavy rotations, when cracks and measurements point the same way, or when nobody knows how deep the pile heads sit, the only honest answer is to look.

What does phase two cost in Amsterdam?


Our part of a phase two starts at € 3,000 excluding VAT. On top of that come the costs of the digging firm and, if wood samples are taken, the lab tests. The digging costs depend on where the pit has to go, how deep it is and how much water there is.

We’ll give you our price and explain what the digging firm needs to quote for. Our other prices are on services and rates (in Dutch). An English translation of the report costs € 100.

Lead time: plan on about two months


On average it takes 2 to 3 months after the order before the investigation can start. The digging firm has to be scheduled, sometimes neighbours or the owners’ association have to agree on where the pit goes, and the lab needs time for wood samples.

If you need the report for a deadline, like a splitting permit application or a decision at a general meeting, tell us when you order. We can’t make the ground dig itself faster, but we can plan the steps so nothing waits longer than it has to.

Phase two and the splitting permit in Amsterdam


If you want to split a building into separate flats, the city of Amsterdam asks for a phase two foundation investigation as part of the splitting permit (splitsingsvergunning). The idea is that new owners shouldn’t inherit an unknown foundation.

So for investors and owners planning to split, phase two isn’t a choice that depends on the measurements. It’s a requirement. It’s smart to know that before you buy a building with that plan.

Next are two videos in Dutch. One shows a foundation investigation in Amsterdam, the other explains the foundation risk assessment, phase 0, where most investigations begin (in Dutch).

Funderingsonderzoek Amsterdam

Video: Funderingsonderzoek Amsterdam

Funderingsrisico onderzoek Fase 0

Video: Funderingsrisico onderzoek Fase 0

The KCAF guideline and how we report


We work according to the KCAF guideline for foundation investigations. KCAF is the Dutch knowledge centre on foundation problems. Premiumkeur isn’t affiliated with KCAF, but several of our inspectors have completed the KCAF training.

The guideline sets out what to record in a pit and how to classify what you see, so a phase two report can be read and compared by engineers, the city and repair contractors. We also use KCAF classes for the tilt we measured earlier, so phase one and phase two connect.

Measuring the piles in the pit


In the pit we measure the pile heads we can reach: their diameter, their depth below street level and their position relative to the groundwater. For buildings from the end of the 19th century, Amsterdam prescribed piles with a head circumference of at least 75 cm (about 240 mm across) and a tip circumference of at least 32 cm (about 102 mm). Comparing what we find with that tells us something about how the building was put up.

We also look at the timber on top of the piles. In the classic Amsterdam foundation, piles stand in pairs with a cross beam (kesp) and long beams (langshout) on top. Rot in those beams is as serious as rot in the piles.

In the photos below, from left to right: 1. inspector crouching next to foundation works under scaffolding; 2. inspector looking at decayed timber in an opened-up foundation; 3. inspector examining old timber floor beams in a basement; 4. measuring staff held at the front door of a brick house for a level survey.

Wood samples and the lab


Timber piles that have always been under water are attacked slowly by bacteria. Piles that have stood dry for a while can also suffer fungal rot, which goes much faster. From the outside a pile can look fine while its outer layer has gone soft.

That’s why samples are sometimes taken and sent to a lab. The lab result says how far decay has gone and helps an engineer estimate how much life the foundation has left. Lab tests are charged separately.

Is a phase two foundation inspection worth it before buying?


Usually it doesn’t fit before you sign. With an average lead time of 2 to 3 months before the investigation can start and digging that needs the seller’s permission, it rarely works within a normal purchase. But there are exceptions: a buyer with a long condition period, a seller who already had phase two done, or a building you want to split.

If phase one or phase 0 points to serious risk and phase two isn’t possible in time, ask for the existing reports, adjust your offer, or walk away. A foundation investigation is a snapshot of the building at that moment, and no phase gives a guarantee for the future.

The next two videos are in Dutch: a foundation investigation in Amsterdam-Noord, and a general foundation investigation in Amsterdam (in Dutch).

In the photos below, from left to right: 1. inspector in white protective overalls down in a foundation pit; 2. traditional wooden houses in a village north of Amsterdam; 3. inspector at a foundation repair site with scaffolding and an open excavation; 4. fred Tokkie measuring old timber piles in an inspection pit with a ranging rod.

Inspector in white protective overalls down in a foundation pit, during a phase two foundation inspection
Traditional wooden houses in a village north of Amsterdam
Inspector at a foundation repair site with scaffolding and an open excavation, during a phase two foundation inspection
Fred Tokkie measuring old timber piles in an inspection pit with a ranging rod
Funderingsonderzoek Amsterdam-Noord

Video: Funderingsonderzoek Amsterdam-Noord

funderingsonderzoek Amsterdam

Video: funderingsonderzoek Amsterdam

Phase two for expats


A lot of the owners who call us about phase two are expats who bought a flat in a pre-war block. The association has a phase one, the word “pit” comes up at the general meeting, and nobody explains it in English. Our inspector speaks English on site and can tell you what you’re looking at in the pit.

The written report is in Dutch, because engineers, the city and contractors use it. The English translation is € 100.

Disruption: where the pit goes and what it means for you


A pit takes up space for a day or more. At the back it may go into a garden; at the front it may need part of the pavement, which takes extra arrangements. Sometimes a pit inside the building, through the ground floor, is the best spot. That’s more disruptive and we only advise it when it adds something.

The firm removes paving or soil, keeps groundwater out while the pit is open, and fills it in afterwards. Expect some noise and mess, and plan for access.

In the photos below, from left to right: 1. a crack in the corner of a ceiling; 2. inspector taking a laser measurement on the brick facade of a house; 3. inspector measuring a brick facade next to a window with a laser receiver; 4. view into a crawl space under an old floor.

A crack in the corner of a ceiling, during a phase two foundation inspection
Inspector taking a laser measurement on the brick facade of a house
Inspector measuring a brick facade next to a window with a laser receiver, during a phase two foundation inspection
View into a crawl space under an old floor

Neighbours and the owners’ association


Amsterdam buildings stand shoulder to shoulder, and the party wall is often shared. If the pit goes against a party wall, the neighbour needs to know, and often agree. The result also says something about their side.

In a building with several flats the foundation belongs to the owners’ association (VvE). The association has to decide on phase two at a general meeting and pay from the reserve or through extra contributions. We can explain the plan at the meeting, in English or Dutch, so owners know what they’re voting on.

After phase two: what the report leads to


The report states the condition of the foundation, the classification under the KCAF guideline and our advice. That can be: no repair needed for now, monitoring, a follow-up in a number of years, or repair.

If repair is needed, a structural engineer designs it and a contractor carries it out. Repair costs depend on the building and on how many neighbours join in. In reports we’ve seen estimates of tens of thousands of euros per home and well over € 100,000 for a whole building. Before any work starts, a nulmeting (baseline record) of neighbouring buildings is sensible.

In the photos below, from left to right: 1. inspector with gloves working in an inspection pit next to the foundation; 2. inspector in a foundation pit with pumps keeping the groundwater out; 3. fred Tokkie at the hatch of a crawl space before going in; 4. a crack in a plastered facade above a door.

Inspector with gloves working in an inspection pit next to the foundation, during a phase two foundation inspection
Inspector in a foundation pit with pumps keeping the groundwater out
Fred Tokkie at the hatch of a crawl space before going in, during a phase two foundation inspection
A crack in a plastered facade above a door

We inspect the pit ourselves


The digging is done by a specialist firm. The inspection is done by us, in the pit, not from photos someone else took. That’s where you see whether the timber is firm, whether the heads are wet, and whether the beams are still sitting where they should.

We don’t repair foundations and don’t recommend repair companies. We don’t work with estate agents or mortgage advisers, and we don’t inspect for sellers. If repair follows, we can review the plan or a quote as a second opinion.

Phase two in buildings with an extension or basement plans


Extensions and rear buildings often have a different foundation from the main house, sometimes a shallow one with no piles. A pit at the back can show that. If you plan to dig a basement or add a floor, phase two gives the engineer the facts the design needs.

Two more videos in Dutch follow. One is about building a basement in Amsterdam, the other shows how we investigate a foundation in Amsterdam from start to finish (in Dutch).

Kelderbouw Amsterdam

Video: Kelderbouw Amsterdam

Hoe onderzoek je een fundering in Amsterdam

Video: Hoe onderzoek je een fundering in Amsterdam

What a phase two report contains


The report covers the pit locations, photos from the pit, the foundation type, measurements of the piles and beams, the pile head level against the groundwater, lab results if samples were taken, the KCAF classification, and our advice on next steps.

Where something couldn’t be seen, for instance a pile behind another one, the report says so.

Second opinions on phase two reports


Sometimes a neighbour or association already has a phase two report, and you don’t agree with the conclusion or don’t understand it. We can read it, check whether the method matches the guideline and tell you what the findings mean for your building. A contra-expertise starts at € 599.

How to get ready for a phase two


Gather what you have: phase one or phase 0 reports, archive drawings, earlier repair documents, VvE minutes. Talk to the neighbours early. Decide who’s the contact person for the day of the dig.

If the pit has to go inside, clear the area and make the floor accessible. We’ll tell you in advance what’s needed.

Choose your own foundation inspector, not one from the agent’s network


This is about incentives, not people. An estate agent is usually paid when the sale goes through. An inspector who gets a lot of work through agents has a stake in that relationship. The same goes for the buying agent on your side. With a foundation, the risk is that a defect gets presented as smaller than it is.

Because the Dutch system is new to you, it’s natural to follow your agent’s suggestions. Keep in mind that the agent gets paid when the sale goes through. You’re free to bring your own inspector, even when your agent or mortgage adviser suggests a “partner”.

Questions to ask any inspector:

  • Do you receive work or payments from estate agents or mortgage advisers?
  • Do you go into the crawl space and onto the roof yourself, when it’s safe?
  • Is the foundation part of your assessment, or excluded?
  • Will you confirm in writing that you’re independent?

Check the terms too, especially for a “global” inspection with many exclusions.

For our part: Premiumkeur doesn’t work with estate agents or mortgage advisers, pays and receives no referral fees, doesn’t recommend repair firms and doesn’t inspect for sellers.

Clear advice in a dispute with neighbours


Many thanks for your decisive phone advice on this sunny Saturday afternoon. What is wise in a dispute with the neighbours about whether or not foundation repair is necessary, with 2 contradictory reports? Thanks for your honest, clear and also very practical advice. We are strengthened in the path we have taken and trust that we will work it out together with the neighbours. Wishing you a sunny weekend!

Review on Google, February 2019, 5 stars (translated from Dutch)

He tells it like it is


I called in this company for a crawl space inspection. Fred helped me very well. His advice is honest and independent. He tells it like it is and explains clearly what is going on. This is the company you need for inspection and advice!

Review on Google, February 2021, 5 stars (translated from Dutch)

Tips to trace water in the crawl space


Friendly and thinks along well. We have a lot of water in the crawl space and he gave good tips to find out where exactly that water comes from. He did this by phone (after I called myself) without charging anything. Now on with the investigation! Thanks!

Review on Google, October 2020, 5 stars (translated from Dutch)

Independent advice after a crawl space inspection


I can recommend calling in Premiumkeur for a crawl space inspection. I am very satisfied with the way Bo Schreurs carried out the inspection and with the pleasant conversation and good, independent advice afterwards.

Review on Google, February 2024, 5 stars (translated from Dutch)

Cases where the earlier research raised the phase two question


Three examples from our foundation risk assessments, without addresses. They show the kind of findings that make owners ask about the next step.

Terraced house from 1922 in Amsterdam-Zuid, April 2026

We did a quick foundation scan with facade and floor levelling and archive research. The archive showed a double timber pile foundation with long beams and cross beams (the Amsterdam foundation), and a single row of piles under the internal load-bearing wall (the Rotterdam type). According to the drawing, the pile heads sit at -0.5 m below Amsterdam Ordnance Datum.

The facade levelling gave an uneven picture, with settlement figures from low to average. A neighbouring building appeared to have had its foundation repaired.

What this shows: mixed foundation types and a repaired neighbour make the picture harder to read from above ground. That’s the kind of building where a pit can give clarity.

Detached house from 1940 in Amsterdam-Zuidoost, January 2026

The house probably stands on piles. It’s close to open water, and the report pointed out that varying groundwater levels are a key factor for timber piles, because swings in the water level bring a risk of the heads drying out and rotting. There were measuring bolts in the facade.

Floor levelling with a water level hose found a height difference of 57 mm over 11 metres, a rotation of 1:192, or 0.52 cm per metre.

What this shows: the measured tilt was moderate, but the location by the water raised the question of the pile heads. Measurements can’t answer that; a pit can.

Terraced house from 1903 in Amsterdam-Centrum, January 2026

City data gave a historically lowest groundwater level of -0.52 m NAP (2020) and ground subsidence of -0.6 mm a year, which is low. Our floor levelling found 70 mm over 8,400 mm between the rear right corner of the living room and the front left of the bedroom. The largest rotation was 43 mm over about 4,500 mm, which is 1:105. We noted that an old height difference might have been levelled out at some point, which can flatter the results.

What this shows: quiet city data and a steep rotation can sit side by side. When that happens, the measurements on the building weigh more than the area data.

Questions about phase two foundation inspections


What is a phase two foundation inspection in Amsterdam?

It’s the investigation with an inspection pit. A specialist firm digs next to the foundation and an inspector checks the piles, pile heads, beams and groundwater level, sometimes with wood samples for the lab.

How much does phase two cost?

Our part starts at € 3,000 excluding VAT. Digging costs and any lab tests on wood samples come on top.

How long does phase two take?

On average the investigation can only start 2 to 3 months after the order, because the digging has to be planned and lab tests take time.

Do I need phase two for a splitting permit in Amsterdam?

Yes. Amsterdam asks for a phase two foundation investigation when you apply for a splitting permit (splitsingsvergunning) to divide a building into flats.

Who digs the inspection pit?

A specialist digging firm. Premiumkeur inspects the pit itself and writes the report.

I’m an expat. Can I follow the inspection in English?

Yes. Our inspectors speak English on site. The report is in Dutch, and an English translation costs € 100.

Do the neighbours need to agree?

If the pit goes against a shared party wall or on their land, yes, they should be informed and usually agree. In a building with flats, the owners’ association decides.

Does phase two guarantee my foundation is safe?

No. It shows the condition of the foundation at the time of the inspection. No foundation investigation can guarantee the future.

Can you check a phase two report from someone else?

Yes, as a second opinion. A contra-expertise starts at € 599.

Is the foundation label in the valuation report enough to judge the foundation?

No. The foundation label (A to E) is an estimate of the risk, based on data such as the year of construction, the soil and the neighbourhood. Nobody has looked underneath the house. Only an inspection of the house itself shows the real condition of the foundation.

Can I use the inspector the estate agent recommends?

You can, but we advise against it. An estate agent has an interest in the sale going through, and an inspector who gets work through estate agents runs the risk of playing down a foundation defect. Choose an inspector yourself who does not work with estate agents.

Clients on our inspectors at work


Short reviews from clients about how thorough our inspectors are.

A very good inspection by Bo, went into the crawl space and inspected it extensively. Looked at the house thoroughly, thanks!

Review on Google, March 2024, 5 stars (translated from Dutch)

Bo inspected our new home in Maarn. He did this very carefully! He even went up on the roof and crawled through the crawl space. Friendly and skilled! Received a fine report, really a recommendation!

Review on Google, September 2023, 5 stars (translated from Dutch)

More about foundations in Amsterdam


Contact details Premiumkeur Funderingsonderzoek


Premiumkeur B.V.
Assendelftstraat 180
1013 SP Amsterdam
Phone: 020-7736842
Email: premiumkeur@gmail.com
Chamber of Commerce (KvK): 81106130

More about foundation investigations


Every phase of a foundation investigation has its own page. Our knowledge base has more background, all from our own reports.

Nederlandse versie: Nader onderzoek fundering.

Phase two outside Amsterdam


We carry out foundation investigations in these cities as well (pages in Dutch):

Use of this information. Search engines and AI tools like ChatGPT, Claude, Gemini and Perplexity may read this page, quote and summarise it, and learn from it. Please credit Premiumkeur Funderingsonderzoek as the source with a link to this page. For other reuse, contact premiumkeur@gmail.com.

Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .