Logo of Premiumkeur Funderingsonderzoek, independent foundation inspectors in Amsterdam

Timber Pile Foundations Amsterdam


Most of old Amsterdam stands on wood. Under a canal house or a 1900s terrace in Oud-West you’ll find timber piles driven through clay and peat into sand. If you’re buying or renovating one, it helps to know what’s under it and what can go wrong. This page explains it in plain English, for expats and anyone else new to Dutch foundations.

We are Premiumkeur Funderingsonderzoek, the foundation team of Premiumkeur B.V. in Amsterdam. The company is run by Fred Tokkie, who was a contractor from 1983 to 2009 and has inspected houses since 2009.

Clients give us 4.9 stars from 704 Google reviews and 104 Trustpilot reviews (see our Trustpilot page, or read a selection on our English reviews page). Want to ask something first? Call ☎ 020-7736842 or send a WhatsApp message to +31 6 2956 3190.

Our main Dutch page is Funderingsonderzoek Amsterdam (in Dutch). If you already know you want an inspection, have a look at phase one foundation inspection in Amsterdam or, if you’re about to make an offer, pre-purchase foundation inspection in Amsterdam.

How a timber pile foundation in Amsterdam is built


The top layers of Amsterdam soil are soft: made-up ground, clay and peat. A brick house would sink into that, so builders drove wooden piles down to the first firm sand layer.

How deep a pile went was decided on site. In Amsterdam, test piles were driven first and the number of blows per set distance (the ‘kalender’, the driving record) had to match tables from the building authority. If a pile didn’t meet the table, extra piles were added or driven deeper.

From the end of the 19th century the city also set minimum sizes. Piles had to have a head circumference of at least 75 cm (about 240 mm across) and a tip circumference of at least 32 cm (about 102 mm). Older buildings often have thinner piles.

The Amsterdam foundation: piles, kesp and longitudinal beams


The classic ‘Amsterdamse fundering’ uses piles in pairs under the front, rear and party walls. On top of each pair lies a short cross beam, the kesp. On top of those run long beams along the wall, the langshout. The brickwork starts on those beams.

Below the brickwork, everything in that chain is wood. That’s why the position of the groundwater matters so much: wood that stays wet and away from oxygen can last for centuries, wood that dries out and gets wet again does not.

Rotterdam foundations and concrete beams on timber piles


In many houses the inner bearing walls or party walls stand on a single row of piles. Dutch reports call that a ‘Rotterdamse fundering’ (Rotterdam foundation), and many houses have both types.

From the 1920s onwards builders started pouring reinforced concrete beams on top of the timber piles instead of laying wooden beams. In a 1928 house in the Rivierenbuurt that we investigated in 2025, the drawings showed timber piles under reinforced concrete beams 30 cm high.

Concrete doesn’t rot, but the timber piles under it still need to stay wet.

Foundations on ‘staal’: no piles at all


Some buildings and many extensions in and around Amsterdam aren’t on piles. A ‘fundering op staal’ is a shallow foundation: a strip of brick or concrete laid straight on the ground, without piles. Despite the name, there’s no steel involved.

On Amsterdam’s soft soil a foundation on staal tends to move more than the piled house next to it. We often see it at rear extensions, sheds and later additions. The extension sinks and a crack opens where it meets the house. That crack doesn’t automatically mean the main foundation is bad.

Groundwater and the height of the pile heads


A timber pile is safe as long as its top stays under water. In Amsterdam the pile heads are usually well over 2.5 metres below street level, while the groundwater sits on average about 80 to 90 cm below street level. So in most houses the wood never stands dry. We look for the exceptions.

Groundwater can drop, for example after dry summers, leaking sewers or nearby building pits. If the top of the piles or the kesp comes above the water for a long period, fungi can attack the wood. To check this we compare the pile head level from archive drawings with groundwater data from the municipality’s monitoring wells (peilbuizen).

The two videos below show a foundation investigation in Amsterdam and a phase 0 foundation risk assessment, where we combine archive research with measurements on site (in Dutch).

Funderingsonderzoek Amsterdam

Video: Funderingsonderzoek Amsterdam

Funderingsrisico onderzoek Fase 0

Video: Funderingsrisico onderzoek Fase 0

Pile rot: bacteria and dry periods


‘Paalrot’ (pile rot) is the Dutch catch-all word for timber piles that lose strength. There are two different processes. Bacteria can break down wood slowly even when it’s fully under water. It’s slow and mostly softens the outer layer of the pile. Fungi need oxygen, so they only attack when the wood stands dry. They work much faster, starting at the pile heads and beams.

You can’t see either from the street, only the effects: a leaning facade, sloping brick courses, cracks, sticking doors. Only an inspection pit (phase 2) shows the wood itself.

Negative skin friction and piles that are too short


Rot isn’t the only reason a timber foundation sinks. Soft layers around the piles keep settling, and as they settle they drag the piles down with them. Engineers call that negative skin friction (‘negatieve kleef’). It adds load to piles designed a century ago.

Some piles never reached the sand properly. And many old houses now carry more than they were built for, such as an extra floor, a roof terrace or a concrete floor. We ask about renovations and check them against the archive drawings.

In the photos below, from left to right: 1. fred Tokkie at the hatch of a crawl space before going in; 2. inspector at a foundation repair site with scaffolding and an open excavation; 3. close look at the edge of a brick facade, checked for leaning and cracks; 4. crack running down the corner of a plastered wall.

Monitoring bolts and the speed of settlement


Amsterdam has a large network of ‘meetbouten’ (monitoring bolts, small metal studs in the facade) that the municipality measures from time to time. The readings show how fast a building or block is settling. Around 1 mm a year is classed as ‘small’ in the KCAF guideline ‘Funderingen onder gebouwen’. Higher figures are a reason to look further.

Bolt data has limits. A bolt on the front facade says nothing about the rear facade or about tilting inside the building. Many houses have no bolt, so we use neighbouring bolts as an indication. It’s one clue, never proof.

Do I need a foundation inspection before buying a canal house in Amsterdam?


We’d say yes, for any building on timber piles that’s more than about 80 years old. A building survey (‘bouwkundige keuring’) looks at the whole house, but it can’t tell you much about the piles. A foundation investigation (‘funderingsonderzoek’) is a separate check.

A phase 0 foundation risk assessment costs € 399 when we do it together with a building survey, from € 898 in total. A phase 1 inspection costs € 699 for a standard house and up to € 1,499 or more for large or complex buildings. More on the steps is on our page about funderingsonderzoek fase 1 (in Dutch).

Next you’ll see two videos: a foundation investigation in Amsterdam-Noord and another foundation investigation in Amsterdam, both filmed on site (in Dutch).

In the photos below, from left to right: 1. measuring staff held at the front door of a brick house for a level survey; 2. cracks in the brickwork at the corner of a building; 3. laser receiver held against the brickwork of a house during a level survey; 4. inspector checking a measuring bolt in the facade next to a front door.

Measuring staff held at the front door of a brick house for a level survey, at an Amsterdam house on timber piles
Cracks in the brickwork at the corner of a building
Laser receiver held against the brickwork of a house during a level survey, at an Amsterdam house on timber piles
Inspector checking a measuring bolt in the facade next to a front door
Funderingsonderzoek Amsterdam-Noord

Video: Funderingsonderzoek Amsterdam-Noord

funderingsonderzoek Amsterdam

Video: funderingsonderzoek Amsterdam

What we measure above ground


In a phase 1 inspection we don’t dig. The main tool is a ‘lintvoegmeting’: we measure the height of one horizontal mortar joint along the facade. Bricklayers laid those joints level, so any difference shows movement.

We also do a floor levelling survey (‘vloerwaterpassing’) on each floor, check for cracks and, where it’s safe, go into the crawl space and onto the roof. If there’s a reason, we measure whether walls lean (a plumb measurement).

What the archive tells us about the piles


The city archive often still has the original drawings, sometimes with a pile plan. For that 1928 house in the Rivierenbuurt they gave a pile head level of 0.70 m below NAP. The design load per pile wasn’t on the drawing, but 80 to 100 kN (8 to 10 tonnes) was normal for that period. (NAP is the Dutch reference level.)

The archive also holds older foundation reports, mutation reports and records of repairs on the block. Archive research costs from € 199 on its own and is included in an extended phase 1.

In the photos below, from left to right: 1. inspector looking at decayed timber in an opened-up foundation; 2. inspector in a foundation pit with pumps keeping the groundwater out; 3. finger pointing at worn mortar joints in a brick wall; 4. inspector measuring the brick foundation wall at the bottom of an inspection pit.

Inspector looking at decayed timber in an opened-up foundation, at an Amsterdam house on timber piles
Inspector in a foundation pit with pumps keeping the groundwater out
Finger pointing at worn mortar joints in a brick wall, at an Amsterdam house on timber piles
Inspector measuring the brick foundation wall at the bottom of an inspection pit

Foundation label and foundation codes are indications


You may see a ‘funderingslabel’ (foundation label A to E) in a valuation report, or an old ‘funderingscode’ in the municipal records. Both are useful. Neither is a guarantee. A label leans on area data and building age, and a code may come from research done years ago.

We read them as a starting point and then check the building itself. Records about the rest of the block, such as repairs on neighbouring houses, can change how you read a code. See funderingscodes in Amsterdam (in Dutch).

What a phase 2 inspection pit shows


If the measurements and the archive don’t give a clear answer, the next step is a phase 2 inspection. A specialist firm digs a pit next to the foundation down to the pile heads. We inspect the pit ourselves, measure the piles and beams and take wood samples for a laboratory.

A phase 2 starts at € 3,000 excluding VAT, plus the cost of digging and any lab tests on the wood. It usually takes 2 to 3 months after the instruction before the investigation can start. In Amsterdam a phase 2 is also needed if you want to split a building into separate flats, for the ‘splitsingsvergunning’ (splitting permit).

In the photos below, from left to right: 1. digital laser receiver on a brick facade showing a level reading; 2. hand holding a laser receiver against a facade to measure how far it leans; 3. inspector kneeling at the front of a house to measure at street level; 4. fred Tokkie measuring old timber piles in an inspection pit with a ranging rod.

Digital laser receiver on a brick facade showing a level reading, at an Amsterdam house on timber piles
Hand holding a laser receiver against a facade to measure how far it leans
Inspector kneeling at the front of a house to measure at street level, at an Amsterdam house on timber piles
Fred Tokkie measuring old timber piles in an inspection pit with a ranging rod

Timber piles in VvE buildings and terraces


A timber foundation is rarely just yours. Under a terrace, the piles under a party wall carry two houses. In a block of flats the whole foundation belongs to the VvE (Vereniging van Eigenaars, the owners’ association).

If you’re buying a flat, ask the VvE for any foundation reports, the maintenance plan and the minutes of recent meetings. Repair costs and decisions are shared. Repairs on a terrace are usually done for several houses at once.

Building a basement or extension on an old timber foundation


We get more and more questions from expats who want to add a basement, dig out a crawl space or put an extension on the back of an old house. All of that touches the foundation. Digging next to timber piles can lower the groundwater locally.

Before you start, have your own foundation investigated so the structural engineer knows what’s there, and get a ‘nulmeting’ (baseline survey) of the neighbouring houses, to record existing cracks. See our Dutch page about the nulmeting (in Dutch).

The videos below are about building a basement in Amsterdam and about how we investigate a foundation in Amsterdam, step by step (in Dutch).

Kelderbouw Amsterdam

Video: Kelderbouw Amsterdam

Hoe onderzoek je een fundering in Amsterdam

Video: Hoe onderzoek je een fundering in Amsterdam

Inspected in English, reported in Dutch


Many of our clients are expats. The inspector on site speaks English and will walk you through what he sees and measures. The written report is in Dutch, which is what banks, notaries and contractors work with. An English translation of the report costs € 100.

Our training and how we work


Premiumkeur is NHG-recognised and works with NEN 2767 (condition measurement) and NTA 8060 (building survey). For foundations we follow the KCAF guideline ‘Funderingen onder gebouwen’. Premiumkeur isn’t a member of KCAF, but several of our inspectors have completed the KCAF training. Our inspectors include Fred Tokkie, Dirk Overduin, Moja Reus, Tim Hollenberg, Daan, Bo Schreurs and Teun Fluit.

What a foundation inspection can and can’t promise


A foundation investigation is a snapshot. It doesn’t guarantee what the piles will do in ten years, because groundwater, neighbours and the weather can change. It does give you a clear basis for a decision.

Choose your own foundation inspector, not one from the agent’s network


In the Netherlands, the estate agent (‘makelaar’) is usually paid only when the sale goes through. That’s also true for the agent you hire to help you buy. An inspector who gets a lot of work through agents has an interest in keeping that relationship good. With foundations the risk is simple: a problem with the piles can come across smaller than it really is.

Because the Dutch system is new to you, it’s natural to follow your agent’s suggestions. Keep in mind that the agent is paid when the sale goes through. You’re free to choose your own inspector, even when the agent or mortgage adviser mentions a ‘partner’, and you can bring your own inspector to the viewing.

Some questions to ask any inspector: do you get work or any payment from estate agents or mortgage advisers? Will you go into the crawl space and onto the roof where that’s safe? Will you give an opinion on the foundation, or does that fall outside the inspection? Will you confirm in writing that you’re independent? And read the terms: some inspections are called ‘globaal’ (general) and exclude a lot.

For the record: Premiumkeur doesn’t work with estate agents or mortgage advisers, doesn’t pay or receive referral fees, doesn’t recommend repair firms and doesn’t inspect for sellers.

Into the crawl space and onto the roof


A lot can be wrong with a house that you as a buyer do not notice. Fred Tokkie does notice it and explains to you straight away what problem lies behind it and how it can be solved. He is fast, flexible and extremely sharp. He climbs onto the roof and dives into the crawl space. You hear very quickly whether the house deserves your love or whether you had better go and look a door further. If you want to know how things stand, take Fred Tokkie along!

Review on Google, June 2018, 5 stars (translated from Dutch)

Foundation investigation for a listed building


Because of the purchase of a national monument (rijksmonument) in Weesp we were looking for a specialist for a building inspection including a foundation investigation. After comparing different service providers, it became clear to us that PremiumKeur uses extra measuring instruments to carry out foundation investigations at competitive prices. Fred was quick and clear in his communication and also immediately available. During the inspection it soon became clear that Fred is bursting with experience and gives completely independent advice. Thanks to the professional advice and the report, which was delivered the next day, we bought the house with confidence. Fred, thanks again!

Review on Google, November 2021, 5 stars (translated from Dutch)

Facade and crawl space of an old chapel


This concerns an old chapel in Alkmaar, in the old centre on the Oudegracht. Fred very quickly saw where the problems are and examined the crawl space, which could be quite dangerous and is certainly laborious. But no problem, because a good inspection is important. The position of the facade, the quality and age of the slates: everything came up and was given useful information that we could work with. His off-the-record advice also turned out to be spot on, because the costs would indeed be considerably higher than we expected. His advice was therefore crystal clear. Thanks Fred, and we will certainly ask you again for a next inspection.

Review on Google, March 2022, 5 stars (translated from Dutch)

Brick courses measured with spirit levels


We called in Fred for the inspection of a farmhouse from 1900. He responded promptly to the request, communication was quick and clear, so the appointment was made quickly too, and he was neatly on time. He does the work with plenty of enthusiasm and in our opinion is very knowledgeable. After paying the invoice we received a neat report, but actually during the inspection we already knew well enough where we stood, because he discussed it with us as he went along. I am not a layperson myself, but it is always good to have a professional look along and judge. Everything was measured with special spirit levels for the level measurement of the brick courses, and we got advice and tips for the renovation, always a nice bonus.

Review on Google, February 2019, 5 stars (translated from Dutch)

Three timber foundations from our own reports


Terraced house from 1906 in Amsterdam-West, February 2025

A basic phase 1 for a VvE. The archive showed a double timber pile foundation with langshout and kespen under the facades and a single row of piles under the bearing walls. The pile heads lie more than two metres below street level, far below groundwater at about 0.4 m, so they were unlikely ever exposed. The building itself had no monitoring bolts, so we used the bolts on a building across the street: 0.4 mm a year on average over 23 years.

What this shows: even without a bolt on the house, archive drawings, groundwater data and nearby readings give a reasoned picture of a classic Amsterdam foundation.

Terraced house from 1904 in Amsterdam-Zuid, January 2025

A four-storey house with a basement, on double timber piles with langshout and kespen. Over 6,300 mm of the front facade we measured a maximum difference of 7 mm (from -40 to -47), a rotation of 1:900, which falls in the category ‘nil’ under the KCAF guideline. Nearby bolts showed 0.7 and 0.8 mm a year, which we qualified as moderate. Groundwater in 2018 was about 1.3 to 1.7 m below the street. The drawings put the foundation at roughly 1.8 m below the street. So the piles may have stood dry in 2018, and we advised further investigation to rule that out.

What this shows: a facade can look fine and measure fine, while the groundwater figures still point to a risk for the timber.

Terraced house from 1903 in Amsterdam-Oud-West, September 2025

A double timber pile foundation with langshout and kespen, a single row of piles under the party walls. The front facade has a municipal monitoring bolt, read between 2000 and 2006: on average 1 mm a year, ‘small’ under the KCAF guideline. An investigation from 2001 in the archive put the building level at 0.59 m above NAP, against 0.80 m on the original drawing, so 0.21 m of absolute settlement since construction. The piles were fairly small, around 200 mm, but the researchers concluded they did carry the load, and their bearing capacity wasn’t a problem.

What this shows: 21 centimetres of settlement in a century sounds alarming, but for this house the differences were very acceptable. Old research in the archive is worth finding.

Questions about timber pile foundations in Amsterdam


How deep are the timber piles under an Amsterdam house?

They were driven to the first firm sand layer. The pile heads usually lie well over 2.5 metres below street level.

Is a house on wooden piles a bad buy?

No. Many timber foundations are still in good condition after a century or more. You just want to know which one you’re buying.

What causes pile rot in Amsterdam?

Fungi attack the wood when the pile heads stand dry for a long time, for example after the groundwater drops. Bacteria can also break the wood down slowly under water. Both weaken the piles.

Can you tell the condition of timber piles without digging?

Partly. Measurements, bolt data and the archive show how the building has behaved. Only a phase 2 inspection pit shows the condition of the wood itself.

How much does a timber pile foundation inspection cost in Amsterdam?

A phase 0 risk assessment is € 399 together with a building survey (from € 898 in total). A phase 1 inspection is € 699 for a standard house, up to € 1,499 or more for large buildings. A phase 2 starts at € 3,000 excluding VAT, plus digging and lab tests.

I’m an expat and don’t speak Dutch. Can I still use your service?

Yes. The inspector speaks English on site and explains the findings as he goes. The report is in Dutch; an English translation costs € 100.

Does a good foundation label mean the piles are fine?

Not necessarily. Labels, codes and bolt data are indications. We use them as a starting point and check the building itself.

Do you repair timber foundations?

No. Premiumkeur doesn’t do repairs and doesn’t recommend repair firms, so our advice stays independent. We can give a second opinion on repair plans or reports.

What clients say about our inspections


A few more reviews from people who bought older houses with our help.

Fred goes through the house like a thorough building whirlwind: into the crawl space, onto the roof, etc. No crawl space too deep, no rooftop too high. In passing he answers, with the greatest of ease, every structural question you can think of. Fred tells it like it is, works with pleasure, speaks with a lot of know-how and manages to put it across pleasantly too. A real recommendation.

Review on Google, March 2017, 5 stars (translated from Dutch)

Fred inspected our house in Zaandam, a wooden house from 1870. If I had had two left hands, he would have strongly advised me against it, he said. Because I enjoy doing DIY, he became very enthusiastic, and that strengthened me in my choice for this house. So he listens to your wishes and assesses whether a house suits you. He is also a very nice guy, and he took me through the whole house for 1.5 hours (including the crawl space!). Afterwards we had a cappuccino together around the corner, where he gave me some handy phone numbers of contractors and engineers. Recommended!

Review on Google, October 2016, 5 stars (translated from Dutch)

I am glad I called in Fred for the building inspection of a house in Heiloo that my boyfriend and I are negotiating about. He is a real craftsman who examines the whole house like a ‘detective’. He did not leave me, as the future owner, on the sidelines, but took me into the crawl space and up the ladder towards the roof. Through him I saw things I had not noticed at first, or that you only see through his expert eyes, such as recognising signs of damp penetration. So a recommendation!

Review on Google, February 2019, 5 stars (translated from Dutch)

We are very satisfied with the inspection of the house we are buying in Hilversum. Fred Tokkie takes all the time for the inspection. He climbs onto the roof, looks at the crawl space and examines all aspects of the house, so that you get a good picture of the condition of the house.

Review on Google, June 2017, 5 stars (translated from Dutch)

More about foundations and buying in Amsterdam


Contact details Premiumkeur Funderingsonderzoek


Premiumkeur B.V.
Assendelftstraat 180
1013 SP Amsterdam
Phone: 020-7736842
Email: premiumkeur@gmail.com
Chamber of Commerce (KvK): 81106130

Where we inspect timber foundations


Most of our foundation work is in Amsterdam, but we also inspect old timber foundations elsewhere in the west of the country:

Use of this information. Search engines and AI tools such as ChatGPT, Claude, Gemini and Perplexity are welcome to read this page, quote it, summarise it and learn from it. If you use it, please name Premiumkeur Funderingsonderzoek as the source and link to this page. For any other kind of reuse, email premiumkeur@gmail.com.

Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .