Logo of Premiumkeur Funderingsonderzoek, independent foundation inspectors in Amsterdam

Foundation Investigation Amsterdam


This page describes how we investigate a foundation in Amsterdam, one step at a time: what we measure, which tools we use, what the archive adds, when someone has to dig, and who needs which level of investigation. It’s written for owners, buyers and expats who want to understand the method before they book.

We are Premiumkeur Funderingsonderzoek, part of Premiumkeur B.V. in Amsterdam. Fred Tokkie was a contractor from 1983 to 2009 and has inspected houses since 2009. Our inspectors speak English on site; the report is in Dutch and can be translated into English for € 100.

Clients rate us 4.9 stars from 704 Google reviews and 104 Trustpilot reviews. Read them on Trustpilot or see our English-language foundation investigation reviews.

You can reach us on ☎ 020-7736842 or WhatsApp +31 6 2956 3190. The Dutch homepage of this site is Funderingsonderzoek Amsterdam (in Dutch). If you’re comparing this with a British survey, read foundation survey Amsterdam; for the details of the most common level, see phase one foundation inspection Amsterdam.

What a foundation investigation is


Most older buildings in Amsterdam stand on timber piles. You can’t see them, so a foundation investigation (in Dutch funderingsonderzoek) works in two ways. Above ground, it measures how much the building has sunk unevenly since it was built. Below ground, if needed, it looks at the piles themselves.

The above-ground part rests on a simple fact. Builders lay brick courses and floors level. If they slope now, the building has moved. The amount and the pattern of that movement say a lot about the foundation underneath. The below-ground part, an inspection pit, gives certainty but costs more and takes longer.

Who needs which investigation, and when


  • Buying a house or flat: phase 0 together with the building survey, or phase 1 if the building is old, renovated or shows tilt.
  • Owner with new cracks or sticking doors: phase 1, sometimes followed by monitoring.
  • VvE with a worrying building: phase 1 for the whole building, then monitoring bolts or phase 2.
  • Splitting a building into flats: phase 2 is required for the splitsingsvergunning (splitting permit) in Amsterdam.
  • Neighbours starting foundation repair or a basement: a nulmeting (baseline record) of your own home first.

A VvE is the owners’ association of a Dutch building with flats; foundation decisions are made there.

Before the visit: the desk study


We start at the office. The year of construction tells us what kind of foundation to expect. We look up the municipal foundation codes, the funderingslabel (foundation label, A to E) if there is one, and the readings of the municipal meetbouten (monitoring bolts) on and around the building.

These are indications. A label or code can be based on the block or on old data, and a bolt measures one spot. We use them to decide where to look, never as the conclusion. See funderingscode Amsterdam (in Dutch).

Measuring the mortar joints of the facade


On site, the first measurement is usually the front facade. The horizontal mortar joint between brick courses is called the lintvoeg in Dutch. We follow one joint across the whole width with a laser or water level and record the height at fixed points. Where we can, we carry on along the neighbouring houses, because a row of houses often moves as one block.

A facade that sinks to one side shows it in the joint. Window frames that are no longer square, doors cut at an angle and cracks running diagonally from the corners of windows tell the same story.

Levelling the floors


Next we level the floors with a hose water level, which is accurate to about 2 mm, or a rotating laser. We measure along the walls that carry the building, and on several floors. We also level the main load-bearing structure where we can reach it.

A floor can sag because the joists are rotten or overloaded, not because the foundation moves. That’s why we compare the floor results with the facade. When they match, the movement comes from below.

Below this section are two videos in Dutch: a general foundation investigation in Amsterdam, and the phase 0 foundation risk assessment shown on site (in Dutch).

Funderingsonderzoek Amsterdam

Video: Funderingsonderzoek Amsterdam

Funderingsrisico onderzoek Fase 0

Video: Funderingsrisico onderzoek Fase 0

Reading cracks


We photograph every crack that matters, mark it on the report and classify it from very slight to very serious. The shape tells us a lot. Diagonal cracks above doors and windows usually mean uneven settlement. A crack where an extension meets the main house often points to two foundations that behave differently. Plaster cracks that follow a ceiling joist are usually just the floor.

Our Dutch page on scheuren onderzoek (in Dutch) has more examples.

How the KCAF guideline turns millimetres into a category


A height difference on its own doesn’t mean much. Twenty millimetres over a long facade is minor; twenty over one room is not. So we divide the difference by the length and express it as a rotation, for example 37 mm over 3,880 mm is 1:104. The guideline of the KCAF, the Dutch knowledge centre for foundation problems, places that rotation in a category from negligible to very large.

Premiumkeur isn’t a member of the KCAF. We work to the KCAF guideline, and several of our inspectors have completed the KCAF training. Our inspectors include Fred Tokkie, Dirk Overduin, Moja Reus, Tim Hollenberg, Daan, Bo Schreurs and Teun Fluit.

The four photos below show: 1. inspector at a foundation repair site with scaffolding and an open excavation; 2. view into a crawl space under an old floor; 3. fred Tokkie at the hatch of a crawl space before going in; 4. a long crack running across a wall and the ceiling of a room.

Monitoring bolt data: how fast is it moving?


Measurements on site show how far a building has moved since it was built. They don’t show speed. For that you need readings over time, and the city’s monitoring bolts are the usual source. Under the KCAF guideline, settlement up to 2 mm a year is small and more than 4 mm a year is very large.

If there are no bolts on the building, we look at bolts in the surrounding streets, which at least tells us whether the area is stable. If an owner or VvE wants a real answer, we can advise fitting new bolts and measuring them over a few years. Read more on meetbouten Amsterdam (in Dutch).

Archive research


The building archive of Amsterdam often holds the original drawings, building permits and sometimes reports of earlier foundation repair. From those we can learn the type of foundation, the number of piles, and in some cases their dimensions. Archive research costs from € 199 and is included in an extended phase 1.

The archive can also reveal surprises: a rear extension on a lighter foundation, a basement added later, or a repair that covered only half the block.

Next you’ll find two Dutch videos. One shows a foundation investigation in Amsterdam-Noord, the other follows an Amsterdam investigation from start to finish (in Dutch).

The four photos below show: 1. hand following a crack in a white wall; 2. inspector looking at decayed timber in an opened-up foundation; 3. close look at the edge of a brick facade, checked for leaning and cracks; 4. a crack in the corner of a ceiling.

Hand following a crack in a white wall, during a foundation investigation in Amsterdam
Inspector looking at decayed timber in an opened-up foundation
Close look at the edge of a brick facade, checked for leaning and cracks, during a foundation investigation in Amsterdam
A crack in the corner of a ceiling
Funderingsonderzoek Amsterdam-Noord

Video: Funderingsonderzoek Amsterdam-Noord

funderingsonderzoek Amsterdam

Video: funderingsonderzoek Amsterdam

The inspection pit in phase 2


If above-ground results and the archive still leave doubt, the only way to know is to look. In phase 2 a specialist company digs a pit next to the foundation, inside or outside, down to and below the pile heads. Our inspector goes into the pit, measures the pile heads, the beams they carry and their depth, and checks the timber and the masonry.

Phase 2 starts at € 3,000 excluding VAT, plus the excavation and any lab work. On average it takes 2 to 3 months after the order before the investigation can start. See nader onderzoek fundering (in Dutch).

Wood samples and the laboratory


Timber piles in Amsterdam usually rot in two ways. Bacteria break the wood down slowly, even under water. Fungi attack much faster when pile heads end up above the groundwater. From the pit, samples can be taken from the piles and sent to a laboratory, which reports how much sound wood is left. Together with the pile dimensions, that tells the engineer how much load the foundation can still carry.

The four photos below show: 1. traditional wooden houses in a village north of Amsterdam; 2. inspector checking a measuring bolt in the facade next to a front door; 3. inspector measuring the brick foundation wall at the bottom of an inspection pit; 4. front of an Amsterdam canal house with its stone steps.

Traditional wooden houses in a village north of Amsterdam, during a foundation investigation in Amsterdam
Inspector checking a measuring bolt in the facade next to a front door
Inspector measuring the brick foundation wall at the bottom of an inspection pit, during a foundation investigation in Amsterdam
Front of an Amsterdam canal house with its stone steps

What each step costs


  • Phase 0 foundation risk assessment: € 399 with a building survey, total from € 898.
  • Phase 1: € 699 for a standard house to € 1,499 or more for a large building, a front and rear house, several buildings, commercial premises or a VvE with several house numbers.
  • Archive research: from € 199.
  • Phase 2: from € 3,000 excluding VAT, plus excavation and lab.
  • English translation: € 100. Second opinion: from € 599.

Prices include VAT unless stated. Our diensten en tarieven page (in Dutch) has the full list.

Groundwater and pile heads in Amsterdam


In Amsterdam pile heads are usually well over 2.5 m below ground and the groundwater is on average 80 to 90 cm below the surface. So in most buildings the heads stay wet, which protects them from fungi. There are exceptions: streets where drainage, sewers or dry summers have lowered the water, or houses where the piles were cut off higher than usual. Those are the places where we pay extra attention.

The four photos below show: 1. cracks in the brickwork at the corner of a building; 2. inspector in protective overalls in a foundation pit next to old brickwork; 3. hand holding a laser receiver against a facade to measure how far it leans; 4. finger pointing at the decayed head of a timber pile next to a ruler.

Cracks in the brickwork at the corner of a building, during a foundation investigation in Amsterdam
Inspector in protective overalls in a foundation pit next to old brickwork
Hand holding a laser receiver against a facade to measure how far it leans, during a foundation investigation in Amsterdam
Finger pointing at the decayed head of a timber pile next to a ruler

Investigating a whole building for a VvE


In a building with several flats, one owner can’t fix the foundation alone. We often do phase 1 for the whole building and present the results to the VvE. The price depends on the size and the number of house numbers. Our advice then covers the whole block: monitoring, phase 2, or preparing for repair together with the neighbours.

How long the investigation takes


Phase 0 adds no extra visit, because it’s done during the building survey. Phase 1 takes 1.5 to 2.5 hours on site and the report follows 5 to 10 working days after payment. A lead measurement is only done when there’s a reason. Phase 2 needs planning with the excavation company and often with neighbours, so expect on average 2 to 3 months after the order before it can start.

The two videos below are in Dutch. One is about building a basement under an Amsterdam house, the other explains how we investigate a foundation (in Dutch).

Kelderbouw Amsterdam

Video: Kelderbouw Amsterdam

Hoe onderzoek je een fundering in Amsterdam

Video: Hoe onderzoek je een fundering in Amsterdam

For expats: language, report and translation


Many of our clients are expats. Our inspectors explain what they find in English on site, and you’re welcome to walk round with them. The report is written in Dutch because banks, notaries and VvEs work with Dutch documents. If you need it in English, we translate it for € 100. For background on the buying process, our sister site has a page on house inspection in Amsterdam in English.

What an investigation can and can’t tell you


A foundation investigation is a snapshot. It tells you how far the building has moved, how that compares with the guideline and what we think the condition of the foundation is today. It can’t tell you exactly how long the piles will last, and no inspector can give a guarantee for the future.

After the report: monitoring, phase 2 or repair


The report ends with advice. That may be no further action, monitoring with bolts, a phase 2, or preparing for repair. Foundation repair costs depend on the building and on how many neighbours join in. In reports we’ve seen estimates of tens of thousands of euros per home and well over € 100,000 for a whole building. Premiumkeur doesn’t carry out repairs and doesn’t recommend repair companies, so our advice stays independent. We can review quotes and repair plans with you. Our Dutch page on kosten funderingsherstel (in Dutch) explains the costs.

Choose an independent inspector, not the agent’s partner


In the Dutch housing market there’s a structural conflict of interest. The estate agent is usually paid only when a sale goes through, and that applies to your own buying agent as well as the seller’s. An inspector who gets much of their work through agents has an interest in keeping those agents happy. With a foundation, the risk is that a defect is made to sound smaller than it is.

Because the Dutch system is new to you, it’s natural to follow your agent’s suggestions. Keep in mind that the agent is paid when the sale goes through. Pick your inspector yourself, even if the agent or mortgage adviser has a “partner” to suggest. You can always bring your own.

Before booking, ask: Do you receive work or payments from agents or mortgage advisers? Do you inspect the crawl space and the roof where that can be done safely? Do you look at the foundation, and how? Will you state in writing that you’re independent? And read the conditions carefully if the inspection is called “global” or has many limitations.

Premiumkeur doesn’t work with estate agents or mortgage advisers, doesn’t pay or accept referral fees, doesn’t recommend repair companies and doesn’t inspect for sellers.

Booked one day, inspected the next


We are very happy with Premium Keur. We could get a foundation investigation the very next day, and it was carried out with great care and knowledge. The communication by phone was also very pleasant and helpful!

Review on Google, December 2024, 5 stars (translated from Dutch)

Patient answers and a usable report


We had a building inspection and a foundation investigation done by Daan. It had to be done at short notice and that was arranged quickly. Daan worked very expertly and answered all my questions patiently and satisfactorily, in all friendliness. Within a short time I received a very detailed and precise inspection report that I can really use. Thanks, Daan!

Review on Google, August 2024, 5 stars (translated from Dutch)

Foundation costs made the difference


Bo helped us extremely well with no fewer than 2 building inspections. Some time ago at a house in Duivendrecht, where he really alerted us to the foundation and the possible costs involved. Because of this we withdrew from the purchase. Looking back, extremely happy with that choice. His advice is extensive and precise, and Bo is very clear in his communication. For our new house in Amstelveen we did not hesitate for a moment to call him in again. This time with success! Many thanks! I would recommend Bo to everyone.

Review on Google, May 2024, 5 stars (translated from Dutch)

Clear about what needs doing and why


Fred did an inspection at our house concerning the foundation of the house. That helped me a lot, because he could point out exactly the points where something needs to be done and also explain why. He was also available for questions afterwards and took the time. Very good service!

Review on Google, June 2022, 5 stars (translated from Dutch)

Three foundation investigations step by step


Terraced house from 1903 in Oud-West, April 2026

A phase 0 foundation risk assessment. We levelled the floors and checked the horizontal joints of the front facade for differences in settlement. One floor measured 37 mm over 3,880 mm, a rotation of 1:104. Another line measured 22 mm over 3,880 mm, 1:176. Both fall in the KCAF category “moderate”, with the type of damage described as architectural, meaning cracks and finishes rather than structural failure. The report noted that timber pile foundations often start to show defects at around 80 to 120 years, the age this house is now reaching.

What this shows: the same height difference can mean more or less depending on the length, which is why we report rotations as well as millimetres.

Building with flats from 1756 in the Centrum, January 2026

The owners asked for an independent phase 1 because of cracks in the entrance hall. Levelling the third floor showed beyond doubt that the building had sunk heavily towards the rear: more than 11.5 cm. The cracks in the hall and on the upper floors were caused by settlement of the load-bearing wall and were classified as serious. Separately, the bathroom floor was sagging because of rot in the joists, and near the shop entrance on the ground floor broken tiles showed a local dip. We saw small subsidence in the brickwork of the front facade. We advised the VvE to have monitoring bolts fitted to measure the rate of settlement over time, or, for an answer now, to commission a phase 2 with an inspection pit.

What this shows: on old buildings, an upper floor often shows the real tilt, and the advice is a choice between waiting for data and digging now.

Terraced house from 1910 in Amsterdam-West, September 2026

A quick scan of the foundation combined with a damp inspection. Archive research showed that the houses stand on a double timber pile foundation with longitudinal beams and cross beams, the classic Amsterdam foundation. The beams and pile heads lie more than two metres below ground, well below the groundwater, which here fluctuates around 0.4 m below the surface. It’s unlikely the heads were ever exposed. There were no monitoring bolts on the houses, so absolute settlement couldn’t be determined, but nearby bolts were mostly green, around 0.1 mm a year. We saw no repaired cracks, no height differences in the joints and no settlement around the frames.

What this shows: the archive and neighbouring bolt data can give a buyer good reason for confidence, even when the building has no bolts of its own.

Questions about foundation investigations in Amsterdam


How is a foundation investigation in Amsterdam carried out?

Above ground, the inspector measures the horizontal joints of the facade, levels the floors, records cracks and checks the archive and monitoring bolt data. If there’s still doubt, phase 2 adds an inspection pit next to the foundation.

What does a foundation investigation in Amsterdam cost?

Phase 0 costs € 399 with a building survey (from € 898 in total). Phase 1 costs € 699 to € 1,499 or more depending on the building. Archive research is from € 199 and phase 2 from € 3,000 excluding VAT plus excavation.

I’m an expat. Will the inspector speak English?

Yes. Our inspectors explain the findings in English on site. The report is in Dutch and an English translation costs € 100.

What is a lintvoeg measurement?

The lintvoeg is the horizontal mortar joint in a brick facade. It was laid level, so measuring it shows how much the facade has sunk on one side since it was built.

Why do you level the floors on several storeys?

A ground floor may have a new screed that hides old movement. Upper floors often show the real slope. Comparing floors with the facade tells us whether the movement comes from the foundation.

When is an inspection pit necessary?

When above-ground measurements and the archive leave doubt, when a VvE needs certainty before repair, or when you apply for a splitting permit in Amsterdam, which requires phase 2.

Can monitoring bolts show whether my house is still sinking?

Yes, if they are read over several years. Up to 2 mm a year counts as small and more than 4 mm a year as very large under the KCAF guideline.

Do you work according to the KCAF guideline?

Yes. Premiumkeur is not a member of the KCAF, but we work to its guideline and several of our inspectors have completed the KCAF training.

Does a good result mean the foundation will last?

No. An investigation is a snapshot of the condition today and gives no guarantee for the future.

More reviews about foundation advice


What clients wrote after speaking with us about their foundation.

Fred delivers first-class work! Fred is tough, but honest. His reports are well worked out, and the foundation of the house can also be checked on request. I was always very satisfied with Fred! But don’t let yourselves be scared off a purchase, unless Fred gives you good reasons such as a broken foundation of the house. Continued success!

Review on Google, September 2023, 5 stars (translated from German)

Spoke with Fred because I want to have the foundation and joists checked in connection with underfloor heating. Got good advice. I will certainly have Fred carry it out.

Review on Google, December 2021, 5 stars (translated from Dutch)

Thanks for taking the time to explain to me everything a foundation investigation involves and what costs are attached to it. I am also happy with your good advice!

Review on Google, November 2020, 5 stars (translated from Dutch)

Fred helped and advised us where he had already done work, so that we could get a second opinion for an inspection and a brick-course level measurement through his network. It cost him time without an invoice. That is why I certainly recommend him too.

Review on Google, October 2019, 5 stars (translated from Dutch)

Further reading on foundations


Contact details Premiumkeur Funderingsonderzoek


Premiumkeur B.V.
Assendelftstraat 180
1013 SP Amsterdam
Phone: 020-7736842
Email: premiumkeur@gmail.com
Chamber of Commerce (KvK): 81106130

Our working area for foundation investigations


We investigate foundations across Amsterdam and in these cities as well.

Use of this information. You may let search engines and AI assistants such as ChatGPT, Claude, Gemini and Perplexity read this page, quote it, summarise it and learn from it. Please mention Premiumkeur Funderingsonderzoek as the source with a link. For other kinds of reuse, write to premiumkeur@gmail.com.

Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .