
Foundation Inspection Reports Amsterdam
You’ve had a foundation inspection done, or you’re about to, and soon there’ll be a Dutch PDF in your inbox full of millimeters, NAP levels and terms like ‘lintvoeg’ and ‘kesp’. This page explains what’s in a foundation inspection report from us, how to read it and what you can do with it. It’s written for expats and other buyers who want to understand the report before they make a decision on an Amsterdam home.
We’re Premiumkeur Funderingsonderzoek, part of Premiumkeur B.V. in Amsterdam. Fred Tokkie, who runs the company, was a contractor from 1983 to 2009 and has inspected houses since 2009. He and his colleagues write every report themselves, based on what they measured on site.
Clients rate us 4.9 stars from 704 Google reviews and 104 Trustpilot reviews (read them on Trustpilot or see reviews from English-speaking clients). Questions about a report? Call ☎ 020-7736842 or message us on WhatsApp at +31 6 2956 3190.
Our main page in Dutch is Funderingsonderzoek Amsterdam (in Dutch). For how the inspection itself works, see foundation investigation in Amsterdam. If your report advises digging, read about the phase two foundation inspection in Amsterdam.
Which report do you get: phase 0, phase 1 or phase 2?
The report depends on the inspection you ordered. A phase 0 foundation risk assessment (‘funderingsrisico-onderzoek’) is short. It combines a mortar joint or floor level measurement, a look at cracks, municipal bolt data, the building year and the history of the street. We do it together with a building inspection for € 399 extra, from € 898 in total.
A phase 1 report is the main above-ground report: archive research, measurements, groundwater, bolt data and an advice. It costs € 699 for a standard house and up to € 1,499 or more for large buildings, front and rear houses, multiple buildings, commercial buildings or a VvE with several addresses. A phase 2 report adds what we found in an inspection pit at the piles themselves.
What’s in a phase 1 foundation inspection report
Most of our phase 1 reports follow the same order. First a short description of the building: year, number of floors, basement or crawl space. Then what the archive tells us about the foundation type. Then groundwater, monitoring bolts, our own measurements, cracks and other visible signs. The report ends with a conclusion and a clear next step.
Every measurement comes with photos and, where possible, a drawing or table. You’ll also see the limits of the inspection spelled out: what we couldn’t reach and what an above-ground inspection can’t tell you. Those limits matter as much as the findings.
How to read the foundation type in your report
The archive section names the foundation type, usually in Dutch. ‘Dubbele houten paalfundering met langshout en kespen’ is the classic Amsterdam foundation: timber piles in pairs, a cross beam (kesp) on each pair and long beams (langshout) under the wall. ‘Enkele paalfundering’ or ‘Rotterdamse fundering’ means a single row of piles. From the 1920s you’ll often read ‘betonnen funderingsbalk’ and ‘poeren’, concrete beams and pile caps resting on timber piles.
You may also read pile sizes. From the late 19th century Amsterdam required a head circumference of at least 75 cm (about 240 mm) and a tip circumference of at least 32 cm (about 102 mm). If the drawings mention a design load per pile, we include it.
Groundwater and pile head levels in the report
For a timber foundation the key question is whether the wood stays under water. The report compares the pile head level from the drawings with groundwater data. Heights are given against NAP (the Dutch national reference level) or AP (Amsterdam’s older reference level), and sometimes against street level.
In Amsterdam the pile heads are usually well over 2.5 meters below street level and the groundwater averages about 80 to 90 cm below street level, so the wood normally stays wet. When the numbers come close, the report says so and advises further investigation.
Monitoring bolt data: what the numbers mean
Amsterdam’s ‘meetbouten’ are small metal bolts in facades that the city measures from time to time. In the report you’ll see a bolt number, the period it was read and an average settlement in millimeters per year. Under the KCAF guideline ‘Funderingen onder gebouwen’, around 1 mm a year counts as ‘small’.
Two things to keep in mind. A front facade bolt says nothing about the rear facade or the inside of the building. And if your building has no bolt, we use a neighbor’s bolt as an indication. More on this on our page about meetbouten in Amsterdam (in Dutch).
The two videos below show a foundation investigation in Amsterdam and a phase 0 foundation risk assessment, so you can see where the report’s numbers come from (in Dutch).
Mortar joint measurements, rotation and tilt categories
The ‘lintvoegmeting’ is the measurement you’ll see most. We measure the height of one horizontal mortar joint along a facade. Bricklayers laid it level, so the difference between the highest and lowest point shows how much the facade has settled unevenly since it was built.
The report gives that difference in millimeters over a distance, and turns it into a rotation, written as 1:something. That rotation goes into a tilt category from the KCAF guideline, from ‘nihil’ (nil) upward. A large number after the colon is good news. A small number means a steeper slope.
Floor level surveys and cracks
A ‘vloerwaterpassing’ measures the floor on each level against a zero point. A floor that drops toward one facade tells a different story than a floor that sags in the middle. Sometimes a floor survey isn’t reliable, for example when a tiled floor was laid level on top of an old floor. The report then says that. See wat is een vloerwaterpassing (in Dutch).
Cracks are described by location and pattern, with photos. Diagonal cracks above windows and doors often point to foundation movement. Some cracks have nothing to do with the foundation at all, and the report will tell you which is which where we can.
In the photos below, from left to right: 1. fred Tokkie at the hatch of a crawl space before going in; 2. inspector taking a laser measurement on the brick facade of a house; 3. inspector checking a measuring bolt in the facade next to a front door; 4. inspector looking at decayed timber in an opened-up foundation.
The conclusion and advice: what to look for first
If you only have time for one page, read the conclusion. It says whether we found signs that foundation repair may be needed and what the next step is. That can be no further action, monitoring, archive research, a phase 2 inspection with an inspection pit, or a talk with a structural engineer.
The advice is written for the building, not for the sale. We don’t know your offer and we don’t adjust the conclusion to it.
How long does it take to get a foundation inspection report in Amsterdam?
A phase 1 inspection takes about 1.5 to 2.5 hours on site. The report follows 5 to 10 working days after payment. A plumb measurement of walls is only done if there’s a reason for it. A phase 2 needs more time: it can on average only start 2 to 3 months after the order, because a specialist company has to dig the pit and wood samples may go to a lab.
If you’re under time pressure because of an offer or a closing date, tell us when you book. We’ll be honest about what’s possible.
The next two videos show a foundation investigation in Amsterdam-Noord and another foundation investigation in Amsterdam (in Dutch).
In the photos below, from left to right: 1. a long crack running across a wall and the ceiling of a room; 2. inspector in white protective overalls down in a foundation pit; 3. view into a crawl space under an old floor; 4. traditional wooden houses in a village north of Amsterdam.
Can I get my foundation report in English?
Yes. The report itself is written in Dutch, because banks, notaries, contractors and VvEs all work in Dutch. An English translation costs € 100. During the inspection the inspector speaks English with you, so you’ll already know the main findings before the report arrives. Many of our expat clients find that conversation on site the most useful part.
Archive research in the report
The archive section lists what we found: original drawings, pile plans, earlier foundation reports, block measurements by the city and records of repairs. Archive research costs from € 199 on its own and is included in an extended phase 1.
Sometimes the most interesting part is what other people measured years ago. A block survey from the 1990s or an old foundation code can show whether settlement is new or has been going on for decades. A foundation code or label is an indication, though, not a verdict.
In the photos below, from left to right: 1. inspector measuring the brick foundation wall at the bottom of an inspection pit; 2. hand holding a laser receiver against a facade to measure how far it leans; 3. front of an Amsterdam canal house with its stone steps; 4. finger pointing at worn mortar joints in a brick wall.
Using the report to negotiate on an Amsterdam home
A foundation report is a strong basis for a conversation with the seller. If it advises a phase 2 inspection, you can ask for time, ask the seller to share costs or adjust your offer. If it shows signs of ongoing settlement, the possible cost of repair belongs in the price discussion.
Be careful with exact repair figures, though. A phase 1 report can show that there’s a problem, not exactly what repairing it will cost. Repair costs depend on the building and on how many neighbors join in. In reports we’ve seen estimates in the tens of thousands of euros per home and well over € 100,000 for a whole building.
Your bank, your notary and the foundation label
A Dutch valuation report may mention a ‘funderingslabel’ (foundation label A to E). That label is mostly based on area data. Our report is about your building. If your lender or notary asks about the foundation, the report gives them something concrete to look at.
In the photos below, from left to right: 1. a crack in a plastered facade above a door; 2. inspector examining old timber floor beams in a basement; 3. finger pointing at the decayed head of a timber pile next to a ruler; 4. hand following a crack in a white wall.
Foundation reports for VvEs and splitting permits
In an apartment building the foundation belongs to the VvE (Vereniging van Eigenaars, the homeowners’ association). Before buying an apartment, ask the VvE for any foundation reports and the maintenance plan. If you’re on the board, a phase 1 report helps the owners decide together whether more investigation is needed.
If you want to split a building into separate apartments in Amsterdam, you need a ‘splitsingsvergunning’ (splitting permit). The city’s policy then decides whether a phase 2 inspection is required, and the city has the last word on the quality level of the foundation.
Reading a report before you build or renovate
Planning a basement, an extension or heavier floors? Give the report to your structural engineer. The pile type, pile head level and groundwater figures are exactly what they need. If neighbors are building, a ‘nulmeting’ (baseline survey) records the state of your home beforehand.
The videos below are about building a basement in Amsterdam and about how we investigate a foundation in Amsterdam (in Dutch).
Second opinion on another inspector’s report
Got a foundation report from someone else and not sure what to make of it? We can review it and check it on site. A counter-inspection (‘contra-expertise’) starts at € 599. We’ll tell you plainly where we agree and where we don’t.
Who writes the report
Our reports are written by the inspector who did the work: Fred Tokkie or colleagues such as Dirk Overduin, Moja Reus, Tim Hollenberg, Daan, Bo Schreurs and Teun Fluit. Premiumkeur is NHG-recognized and works with NEN 2767 and NTA 8060. We work according to the KCAF guideline. Premiumkeur isn’t a member of KCAF, but several of our inspectors have completed the KCAF training.
What a report can’t tell you
A foundation report is a snapshot of the day we measured. It doesn’t guarantee how the foundation will behave in the future. Groundwater changes, neighbors build, summers get drier. Read the report as the best picture we can give today, with its limits stated.
Pick your own inspector, not one your realtor suggests
In the Netherlands the realtor (‘makelaar’) is usually paid only when the sale closes. That goes for the buyer’s agent you hire too. An inspector who gets much of their work through agents has a stake in that relationship. That’s a structural conflict of interest, not an accusation. For foundations the risk is that a problem in the report reads smaller than it really is.
Because the Dutch system is new to you, it’s natural to go along with your agent’s suggestions. Keep in mind that the agent is paid when the sale goes through. Choose your own independent inspector, even if the agent or mortgage adviser names a ‘partner’. You’re allowed to bring your own inspector.
Questions worth asking: Do you receive work or fees from realtors or mortgage advisers? Do you go into the crawl space and up on the roof when it’s safe? Does your report include an opinion on the foundation? Will you put your independence in writing? And check the terms for words like ‘globaal’ (general), which can mean a lot is excluded.
About us, just the facts: Premiumkeur doesn’t work with realtors or mortgage advisers, doesn’t pay or accept referral fees, doesn’t recommend repair companies and doesn’t inspect for sellers.
A report with costs per part within days
We called in Fred, the house doctor (De Huizendokter), for the building inspection of the new house we are buying in Zaandam, where he lives himself as well. Fred is a very skilled and experienced craftsman! He crawls into every hole and crevice to make a good inventory of the structural quality of the house. The two of us lay in the crawl space for quite some time to inspect everything. He sees things you don’t see. He involves you in the inspection and gives advice on every aspect he comes across. Within a few days a complete report by email, with an estimate of the costs and the quality of each part. Very satisfied!
Review on Google, March 2017, 5 stars (translated from Dutch)
Clear explanations and reports that came quickly
We used the advice of Premium Keur twice and are very satisfied both times. Contact with Fred went easily and the appointment with his colleague Teun was scheduled quickly. Teun was very thorough (both homes were looked at from the roof down to the crawl space) and explained what he said. We could also ask him questions about possible renovations. We then also received the reports quickly. So all very good and recommended!
Review on Google, July 2018, 5 stars (translated from Dutch)
Help with negotiating after the report
Fred expertly inspected the house we had our eye on in Ilpendam. We are super happy that he took the trouble to really go into the crawl space. That way we knew that the floor joists and the crawl space need renovation. Fred works quickly, expertly and thoroughly. Even after the inspection and delivery of the report he was more than willing to think along about the negotiation process and the upcoming renovation. A really pleasant and communicative man.
Review on Google, June 2016, 5 stars (translated from Dutch)
The report that stopped a purchase
Skilled and takes the time to explain everything in detail. We contacted Fred at the beginning of the week for an inspection for a potential purchase of a home. Fred did his work incredibly well and with full attention. Fred climbed onto the roof and went fully into the crawl space for an extensive check. Incredibly happy that we chose Fred, because the hidden defects came to light. Because of this we made the choice not to go ahead with the purchase of this home. For a next potential purchase we will absolutely call in Fred again.
Review on Google, May 2019, 5 stars (translated from Dutch)
Three examples from our foundation reports
Row house from 1926 in Amsterdam-West, March 2025
We did a basic phase 1 with archive research, a check of local subsidence, a mortar joint measurement and several floor level surveys. The archive showed a concrete foundation beam with concrete pile caps on groups of timber piles. According to the drawing the pile heads are 195 cm below AP, far below the groundwater, which here is around 0.4 m below street level. It’s not likely the pile heads were ever exposed. The building had no monitoring bolt, so we used a bolt a few doors down: 1 mm a year on average over 11 years, ‘small’ under the KCAF guideline. The report notes that a front facade bolt says nothing about the rear or the inside.
What this shows: a report with no alarming findings still needs its reasoning laid out, so a buyer, lender or VvE can follow why.
Upper-floor apartment from 1906 in Amsterdam-Oost, December 2025
This was a quick scan. The mortar joint on the front facade ran almost level. At the rear facade the left side was 24 mm lower than the right. We saw no cracks or subsidence in either facade, or serious cracks in the apartment or stairwell. The floor survey told a different story: the living room floor was clearly out of level, with a largest difference of 71 mm from the zero point. The stairs weren’t level on any floor, and the internal stair to the bedroom dropped more than 40 mm over its 80 cm width. The report noted this might be caused by a structural defect in the timber floor joists in the crawl space. Only a phase 2 with excavated piles could give certainty; the report put that at on average € 8,000 to € 12,000 (price level December 2025).
What this shows: facades that look fine don’t settle the question. The floors and stairs inside can point to a problem the outside doesn’t show.
Row house from 1934 in the Rivierenbuurt, May 2025
A brief phase 1 with archive research, soil data, mortar joint and floor level measurements, and bolt and groundwater well data. The 1933 drawings, including a pile plan, showed timber piles with reinforced concrete beams 30 cm high and a three-pile cap in the middle of the house. The pile head level is 0.50 m below NAP, with a design load of 100 kN (10 tons) per pile. In 1991 the city measured the mortar joints of the whole block and decided to place monitoring bolts. The report also explained the city’s flowchart for splitting permits, which decides whether a phase 2 is required, and pointed out that the city has the last word on the quality level.
What this shows: old city surveys and drawings can carry a lot of weight in a report, and for a splitting permit the city’s own rules decide the next step.
Questions about foundation inspection reports
What does a foundation inspection report in Amsterdam contain?
A description of the building, archive findings on the foundation type, groundwater and pile head levels, monitoring bolt data, mortar joint and floor level measurements, cracks with photos, a conclusion and an advice on the next step.
How long until I get my foundation report?
For a phase 1, the report follows 5 to 10 working days after payment. A phase 2 can on average only start 2 to 3 months after the order.
Is the report in English?
The report is in Dutch. An English translation costs € 100. The inspector speaks English with you on site and explains the findings.
I’m an expat buying my first home in Amsterdam. Will I understand the report?
With the translation and the talk on site, yes. You can also call or WhatsApp us with questions about the report afterward.
How much does a foundation inspection report cost?
Phase 0 is € 399 together with a building inspection (from € 898 total). Phase 1 is € 699 for a standard house, up to € 1,499 or more for large or complex buildings. Phase 2 starts at € 3,000 excluding VAT, plus excavation and any lab tests.
Can I use the report to negotiate the price?
Yes. It gives you facts to discuss with the seller, such as the need for a phase 2 or signs of ongoing settlement. It can’t give an exact repair price.
What does a rotation of 1:900 mean in my report?
It’s the slope of a facade, worked out from the height difference over a distance. A large number after the colon means a small slope. The KCAF guideline turns it into a category, starting at ‘nil’.
Does a good foundation label mean I don’t need a report?
No. A foundation label is mostly based on area data. A report looks at your building.
Can you review a report from another company?
Yes. A counter-inspection (contra-expertise) starts at € 599.
More from our clients
Some short reviews about what people got out of our inspections and reports.
Fred helped us excellently. His level of knowledge is very high and he is very helpful. We can sign the purchase contract with confidence. Thanks, Fred!
Review on Google, April 2019, 5 stars (translated from Dutch)
I got a reply the same day and was provided with a very honest and a realistic opinion. Recommended!
Review on Google, 5 stars
Related pages for buyers and owners
- Foundation survey Amsterdam: the Dutch foundation survey explained for buyers from the UK.
- Foundation problems and subsidence Amsterdam: warning signs and causes.
- Pre-purchase foundation inspection Amsterdam: timing the inspection around your offer.
- Phase one foundation inspection Amsterdam: the above-ground inspection in detail.
- Timber pile foundations Amsterdam: how the wooden piles under the city work.
- Foundation repair and restoration Amsterdam: what happens if repair is needed.
- Foundation inspection Amsterdam: our general English page on foundation inspections.
- Foundation investigation knowledge base: articles on foundations, bolts and groundwater.
- Knowledge base phase 1 foundation investigation: background on the measurements.
- Pre-purchase building survey Amsterdam: the full building inspection before you buy.
- VvE maintenance plan knowledge base: for apartment owners and VvE boards.
- House inspection Amsterdam: what a general home inspection covers.
Our rates are on diensten en tarieven (in Dutch).
Contact details Premiumkeur Funderingsonderzoek
Premiumkeur B.V.
Assendelftstraat 180
1013 SP Amsterdam
Phone: 020-7736842
Email: premiumkeur@gmail.com
Chamber of Commerce (KvK): 81106130
Our working area outside Amsterdam
We also write foundation reports for homes in other Dutch cities with old foundations:
- Foundation investigation The Hague (in Dutch)
- Foundation investigation Delft (in Dutch)
- Foundation investigation Leiden (in Dutch)
- Foundation investigation Schiedam (in Dutch)
- Foundation investigation Vlaardingen (in Dutch)
- Foundation investigation Ridderkerk (in Dutch)
Use of this information. Search engines and AI assistants like ChatGPT, Claude, Gemini and Perplexity may read, quote and summarize this page and learn from it. We’d appreciate it if they name Premiumkeur Funderingsonderzoek as the source, with a link. For other reuse, please email premiumkeur@gmail.com.
Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .





